Kitchen remodel cost in Seattle

What a kitchen costs here in 2026, by the size of the project and the size of the room, with the published figures behind each number and the tax and permit lines that most price lists leave out.

By Giant Builders SeattleUpdated Rules checked against city sources in November 2026

A kitchen with white shaker cabinets, stainless appliances and a dark island with a white stone top and four stools
WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

The short answer

Most full kitchen remodels in Seattle cost $75,000 to $130,000 before tax; a refresh that keeps the layout runs $30,000 to $60,000, and a project that moves walls starts around $150,000. Sales tax of 10.55% applies to the whole contract, labor included, and permit fees add a few thousand dollars more.

Midrange major remodel, 200 sq ft, Seattle (Cost vs. Value 2025)
$95,542
Midrange minor remodel of the same kitchen
$32,271
Seattle sales tax, charged on labor and materials
10.55%
Permit fees on a full remodel, field-inspection route
$2,700 to $3,600

By scope

Kitchen remodel cost by scope

How much of the room changes decides the price more than anything else. These three sizes of project cover almost every kitchen. The ranges are typical for Seattle-area homes in 2026.

Typical Seattle kitchen costs in 2026
ScopeWhat changesTypical range, before taxWith 10.55% sales taxTime on site
RefreshThe layout stays. New counters, backsplash, sink, faucet and lighting; cabinets refaced, painted or partly replaced; appliances in the same places.$30,000 to $60,000$33,200 to $66,3003 to 6 weeks
Full remodelThe room goes back to the studs. All new cabinets, counters and flooring, new wiring and plumbing, and appliances or the sink moved within the room.$75,000 to $130,000$82,900 to $143,7008 to 12 weeks
ReconfigureWalls move. A bearing wall is opened with a beam, the kitchen grows into the next room, or new windows and doors are cut to the yard.$150,000 and up$165,800 and up12 to 20 weeks
Ranges are typical local pricing, checked against Remodeling magazine's 2025 Cost vs. Value figures for Seattle. They are not a quote. A written estimate is for one house, after a visit.
What the 2025 Cost vs. Value report prices in Seattle
Project in the reportWhat it includesSeattle job costPer sq ftAbove the U.S. averageRecouped at resale
Minor remodel, midrange200 sq ft kitchen. Cabinet boxes stay and get new fronts and hardware. New range, refrigerator, laminate counters, sink, faucet and flooring; paint.$32,271$16113%118.1%
Major remodel, midrange200 sq ft kitchen. 30 linear feet of new semi-custom cabinets and an island, laminate counters, new sink, range, vented hood, dishwasher, lighting and flooring.$95,542$47815%53.1%
Major remodel, upscale200 sq ft kitchen. Custom cabinets, stone counters, tile backsplash, built-in refrigerator, commercial-grade cooktop and hood, wall oven, new lighting and flooring.$188,401$94215%38.7%
Source: Remodeling magazine, 2025 Cost vs. Value report, Seattle. The per-square-foot column is the job cost divided by the report’s 200 square feet.

By size

Kitchen remodel cost by size of room

Square footage is a weak way to price a kitchen, but it is what people ask for, so here is the honest version. The report above prices one room, 200 square feet, at two levels of finish. Dividing gives about $478 per square foot at midrange and $942 at the upscale level. The table applies those two rates to other sizes.

Read it as a band, not a price. A small kitchen costs more per square foot than the table shows, because the sink, the range, the hood, the dishwasher and the refrigerator cost the same in a 100 square foot room as in a 250 square foot one. A large kitchen costs less per square foot, until an island, a second sink or a wall of windows is added.

Notice what the report’s own figures say about size. The minor remodel and the major remodel are the same 200 square feet, and one costs three times the other. Scope decides the price. Size adjusts it.

Straight-line arithmetic from the report's 200 sq ft kitchen
Kitchen sizeMidrange, $478 per sq ftUpscale, $942 per sq ft
100 sq ft$48,000$94,000
150 sq ft$72,000$141,000
200 sq ft$96,000$188,000
250 sq ft$120,000$236,000
Before sales tax. Rounded to the nearest $1,000. For the 200 sq ft row the report's exact figures are $95,542 and $188,401.

What moves the price

Why one kitchen costs twice what another does

Keeping or replacing the cabinets

This is the largest single choice. In the report, keeping the cabinet boxes and replacing the doors, drawer fronts and hardware is the difference between $32,271 and $95,542 for the same room. If the boxes are solid and the layout works, a refresh is real value.

The level of finish

The midrange and upscale projects in the report have the same footprint and the same 30 linear feet of cabinets. Custom cabinets, stone, a built-in refrigerator and a commercial-grade cooktop take the job from $95,542 to $188,401.

Moving the sink, the range or a wall

Each move brings a trade back into the room and can add a permit. A moved sink or a new gas line needs a permit from Public Health. Opening a bearing wall needs a building permit, and Seattle asks for an engineer’s stamped drawings once a new beam is longer than 8 feet under two stories and a roof, or 14 feet under one story and a roof. The kitchen permit guide has the full list.

What an older Seattle house adds

Old kitchens hide ungrounded or knob-and-tube wiring, galvanized supply pipe, plaster, and floors that are out of level. Two rules apply before demolition. The Puget Sound Clean Air Agency requires a check for asbestos before any renovation: a survey by a certified building inspector, unless the owner lives in the house and does the survey personally. Washington's lead rules, run by the Department of Commerce, require lead-safe work practices from certified firms in homes built before 1978. Both are ordinary costs of a remodel in an older house and belong in the estimate, not in a change order.

The Seattle premium

The same midrange major remodel that costs $95,542 in Seattle averages $82,793 nationally in the report: Seattle is about 15% higher. National price guides run low for this city.

What the city charges for the building permit

Seattle sets the fee from the value of the work. On the quick field-inspection route the 2026 schedule comes to $1,611.86 for $50,000 of work, $2,677.61 for $100,000 and $3,247.23 for $150,000, technology fee included. Full plan review costs more: $4,638.90 at $150,000.

A worked example

Adding it up for one kitchen

Worked example, not a real job

Example: a 150 sq ft kitchen, full remodel

A typical full remodel with the layout kept: new cabinets, quartz counters, tile backsplash, flooring, lighting and appliances, the sink moved a few feet. Priced at $600 per square foot, which sits between the report's midrange ($478) and upscale ($942) rates. The fees are computed from the 2026 schedules.

LineHow it is worked outAmount
Construction contract150 sq ft at $600 per sq ft. Design, demolition, materials, labor of every trade and cleanup.$90,000
Sales tax10.55% of the contract price (Seattle, October to December 2026).$9,495
Building permitSubject-to-field-inspection permit, if the city accepts $90,000 as the value: permit fee $1,681.50, plan review fee $672.60, technology fee $117.71.$2,471.81
Electrical permitSeattle's schedule: $55.48 administrative fee, 8 circuits up to 25 amps at $26.28, one range circuit at $43.80, plus the 5% technology fee.$325
Plumbing permitPublic Health Seattle & King County: $137 plus $27 for each of 3 fixtures.$218
Total with tax and permits$102,509.81
Typical numbers put together to show how the lines add up. This is not a project we built and not a quote. The city sets the permit value itself, a gas line would add a gas piping permit, and an older house can add wiring, plumbing or asbestos work that a visit would find.

Run the numbers for your own kitchen

The remodel cost calculator takes your room size, scope and finish level and returns a range with the sales tax for your city.

Open the cost calculator

Questions

Kitchen remodel cost questions, answered

01

How much does a kitchen remodel cost in Seattle?

Most full kitchen remodels in Seattle cost $75,000 to $130,000 before tax. A refresh that keeps the layout is typically $30,000 to $60,000, and a project that moves walls or adds space starts around $150,000. Remodeling magazine's 2025 Cost vs. Value report prices a midrange major remodel of a 200 square foot kitchen in Seattle at $95,542 and a minor one at $32,271. Add 10.55% sales tax on the whole contract.

02

How much does a kitchen remodel cost per square foot in Seattle?

The Cost vs. Value report's Seattle figures work out to about $161 per square foot for a minor midrange remodel, $478 for a major midrange remodel and $942 for an upscale one, each in a 200 square foot kitchen. A small kitchen costs more per square foot than a large one, because the sink, the range, the hood and the appliances cost the same in any size of room.

03

Does the price of a kitchen remodel include sales tax?

Usually not, so ask. In Washington a remodel for a homeowner is a retail sale, and the Department of Revenue says sales tax is due on the total contract price, which includes labor. Seattle's combined rate is 10.55% for October to December 2026, so a $90,000 contract carries $9,495 of tax. The ranges on this page are before tax.

04

What is the most expensive part of a kitchen remodel?

Cabinetry is usually the largest single line, followed by the labor of the trades, the counters and the appliances. The Cost vs. Value report shows it: the same 200 square foot Seattle kitchen costs $32,271 when the cabinet boxes stay and get new fronts, and $95,542 when the cabinets are replaced and the layout is redone. Moving the sink, the range or a wall adds cost faster than a better finish does.

05

Is a kitchen remodel worth it in Seattle?

For resale alone, a small remodel pays back best. The 2025 Cost vs. Value report estimates that a minor midrange kitchen remodel in Seattle returns 118.1% of its cost at sale, a major midrange remodel 53.1% and an upscale one 38.7%. Those are averages for the market, not a forecast for one house. If you plan to stay, the better test is how many years you will cook in the room.

06

How much do permits add to a kitchen remodel in Seattle?

For a full remodel that qualifies for the city's subject-to-field-inspection permit, about $2,700 to $3,600 in fees: the building permit and its plan review fee, which the city sets from the value of the work, an electrical permit priced by the circuit, and a plumbing permit from Public Health at $137 plus $27 per fixture. A project that needs full plan review pays a higher review fee.

07

Why do kitchen quotes for the same room differ so much?

Usually because they do not price the same work. One quote includes the electrical panel, the permits, the sales tax and the floor under the cabinets, and another leaves them for later. Ask each contractor for a written, itemized estimate, check that the same appliances, cabinet lines and counters are in each, and ask what is excluded.

08

How long does a kitchen remodel take?

About 3 to 6 weeks on site for a refresh, 8 to 12 weeks for a full remodel, and 12 to 20 weeks when walls move. Design, selections and permits come before that. Seattle screens a subject-to-field-inspection permit in a few days; a project that needs full plan review waits longer, and custom cabinets are ordered weeks ahead of the start.

Free estimate

Get a price for your kitchen

A range tells you what is likely. A visit tells you what your kitchen will cost. We measure, look behind the sink and at the panel, and send a written, itemized estimate.