Before and after · Kitchens
Kitchen remodel before and after photos
Giant Builders project photos. Each pair is one kitchen before the work and the same kitchen after it. Drag the line across a photo to compare the two.
- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
Kitchens, before and after
Drag the line, or use the arrow keys, to wipe from the room as it was to the room as it is now. The photos are shown without addresses or names.
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
What to look for in a kitchen before and after
- The layout. Did the sink, the range or the refrigerator move, or did a wall come out to open the room?
- The cabinets. Do they now reach the ceiling, and are there more drawers where doors used to be?
- The counters and the island. Is there more working surface, and seating where there was none?
- The lighting. Count the recessed lights, the pendants and the lights under the cabinets in the second photo.
- The floor. Is it one continuous floor into the next room, with no strip where the old one ended?
A before and after pair shows the finish. It does not show the wiring, the plumbing, the framing and the permits behind it, which is where most of the work in a remodel goes.
Our kitchen remodeling page explains what is included, what it typically costs in Seattle and how the work runs. If you are still choosing a look, the kitchen design ideas are grouped to make that easier.
Free estimate
Want this for your kitchen?
Tell us a little about the room. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
