
Granny flats · Seattle & the Eastside
Granny flat builders in Seattle
A small, complete home on your own lot for a parent, a grown child or a tenant. The building code calls it an accessory dwelling unit. We plan it, permit it and build it.
Free estimate
Talk through a granny flat for your home
Tell us who it is for and where the property is. We come out, look, and send a written estimate.
License GIANTBS782RZ
A Washington general contractor. Look up the record with the state before you call.
5-year workmanship warranty
On the work our crews build in your home, set out in writing with the estimate.
A free, written estimate
We visit, measure and send an itemized price. You decide with every line in front of you.
Permits filed by us
We prepare the drawings and the applications, and we meet the inspectors.
Your options
Three ways to add a granny flat
Granny flat, mother-in-law unit, backyard apartment: they are all accessory dwelling units, and there are three places to put one.
A cottage in the back yard
A separate small house behind the main one, with its own door, kitchen and bath. The code calls it a detached accessory dwelling unit, or DADU. It is the most private choice and the most construction: a foundation, new utility lines and a full permit review.
A unit inside the house
A basement or a wing of the house turned into its own home. The walls and roof already exist, so the work is inside: finishing the basement and adding a kitchen, a bath and a separate entrance.
A converted garage
A garage that becomes a small home. The shell is there. It needs insulation, windows, plumbing, heat and a floor made for living on. See garage conversions.
Not sure which one suits your house? That is the first thing we work out at the visit. The ADU and DADU service page compares the three in more detail.
For family
A granny flat built for an older parent
If the unit is for a parent, say so at the first visit. The choices that make a home easy to live in at 80 are simplest to make while it is still a drawing.
The unit can sit on one level where the lot allows it, with a path from the street or the main house that has no steps and a bathroom planned around a shower you can walk or roll into. A home planned this way looks like any other well-planned small house.
What we can draw in from the start
- A step-free path and entrance
- Bedroom, bath, kitchen and laundry on one level
- Doorways and halls wide enough for a walker or a wheelchair
- A curbless shower with a bench
- Solid backing in the bathroom walls, so grab bars can go in now or later
- Lever handles, bright lighting and switches within easy reach
The rules
Granny flat rules in Seattle and the Eastside
Every city writes its own rules for accessory dwelling units. These are the main ones for Seattle, three Eastside cities and the county land outside them.
| Place | Units per lot | Size limit | Also |
|---|---|---|---|
| Seattle | Up to two, attached or detached in any mix | 1,000 sq ft, or 1,200 sq ft with three or more bedrooms | No owner-occupancy rule. No parking required. |
| Bellevue | Up to two | 1,200 sq ft | No owner-occupancy rule. Rentals must be for 30 days or more. |
| Kirkland | Two per single-family home, in any mix | 1,200 sq ft | A unit may be sold separately from the main home. |
| Redmond | Two accessory units or tiny homes | 1,000 sq ft | A tiny home counts as one of the two. |
| Unincorporated King County | Two on urban lots, one on rural lots | 1,000 sq ft heated, plus 1,000 sq ft unheated | A notice on the property title is required. No added parking. |
Cost
What a granny flat costs
We do not print a price of our own here, because a price without a house and a plan is a guess. These are the figures that have been published.
| What | Amount | Published by |
|---|---|---|
| Accessory dwelling unit, Seattle | $210,944 | Remodeling magazine, 2025 Cost vs. Value report |
| Detached cottage, ranges Seattle-area builders published in 2026 | $180,000 to $750,000 | Builders' published price lists |
| Sales tax on the whole contract, labor included | Seattle 10.55%, Bellevue 10.3%, Kirkland and Redmond 10.4% | Washington Dept. of Revenue, rates for October to December 2026 |
A basement or garage unit starts from walls and a roof that already exist, so there is less to build than with a new cottage. The ADU cost calculator gives a budget range for each route, and your written estimate is for your home.
Ideas
What a granny flat can look like

IllustrationA step-free entrance: a wide ramp with handrails and a covered door. 
IllustrationLiving room and kitchen in one bright space on a single level. 
IllustrationTwo stories on a small footprint, for a lot with little yard to spare.
The pictures on this page, the one at the top included, are illustrations made on a computer to show the kind of building described. They are not photographs of finished projects.
Process
How the project runs
- 01
Visit
A free visit. We look at the yard, the basement and the garage, and hear who the unit is for.
- 02
Plan and price
A layout for the route that fits your home, with a written, itemized price for the whole job.
- 03
Permits
We prepare the drawings and file the building, electrical and plumbing permits with your city.
- 04
Build and walkthrough
One project manager runs the work. At the end we walk the unit with you and close out every item.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Granny flat questions, answered
01What is a granny flat?
A small, complete home on the same lot as a house, with its own entrance, kitchen and bathroom. The building code calls it an accessory dwelling unit, or ADU. Mother-in-law unit, in-law suite, backyard apartment and backyard cottage are other names for the same thing. A detached one is a DADU.
02How much does a granny flat cost in Seattle?
Remodeling magazine's 2025 Cost vs. Value report lists $210,944 for an accessory dwelling unit in Seattle. Seattle-area builders that publish their prices list detached cottages from $180,000 at the small end to $750,000 for a large two-story one. A basement or garage unit starts from a shell that already exists, so there is less to build. Washington sales tax applies to the whole contract: 10.55% in Seattle.
03Do I need a permit to build a granny flat?
Yes. In Seattle, creating an accessory dwelling unit needs a building permit that goes through plan review. It does not qualify for the city's quicker field-inspection permit. Electrical permits come from the city and plumbing permits from Public Health Seattle & King County. Other cities have their own permit offices. We prepare and file the permits.
04Can I build one for a parent now and rent it out later?
In Seattle, yes: there is no owner-occupancy rule, so the unit can house family now and a tenant later. Bellevue has no owner-occupancy rule either, and requires rentals to be for 30 days or more. Check your own city's rule before you count on rent.
05How big can a granny flat be?
In Seattle, up to 1,000 square feet, or 1,200 square feet with three or more bedrooms. Bellevue and Kirkland allow up to 1,200 square feet and Redmond up to 1,000. In unincorporated King County the limit is 1,000 square feet of heated space plus 1,000 unheated.
06Can a granny flat be sold separately from the house?
In Seattle it can be sold as a condominium unit, but it cannot be split off onto its own lot: the city's rules say an accessory dwelling unit may not be separated from the principal unit through subdivision. Kirkland allows a unit to be sold separately.
07How long does it take?
For a new cottage, plan on about a year from the first drawings to move-in. A basement or garage unit is a smaller build. With one of Seattle's pre-approved cottage plans, the city says the permit is issued in 2 to 6 weeks in most cases. We give you a schedule before work starts.
08Which areas do you serve?
Seattle and the Eastside, including Bellevue, Kirkland, Redmond, Mercer Island, Renton and Issaquah, and south through Kent, Auburn and Federal Way to Tacoma.
Start with a visit to your home
We look at the yard, the basement and the garage, and tell you which route makes sense. The estimate is free and in writing.
More detail
Sources
- 01Seattle Ordinance 127211 (adds SMC 23.42.022, accessory dwelling units) (read Nov 18, 2026)
- 02SDCI Building Connections: new middle housing codes (March 2, 2026) (read Nov 18, 2026)
- 03One Seattle Plan: updated Neighborhood Residential zone standards (January 2026) (read Nov 18, 2026)
- 04Seattle SDCI: accessory dwelling units (read Nov 18, 2026)
- 05Seattle SDCI Tip 316: subject-to-field-inspection permits (read Nov 18, 2026)
- 06Washington law on accessory dwelling units: RCW 36.70A.681 (read Nov 18, 2026)
- 07Bellevue Land Use Code 20.20.120: accessory dwelling units (read Nov 18, 2026)
- 08Kirkland Ordinance O-4905 (KZC 115.07, accessory dwelling units) (read Nov 18, 2026)
- 09Redmond Zoning Code 21.04.1110 (read Nov 18, 2026)
- 10King County: residential accessory dwelling units information sheet (March 2026) (read Nov 18, 2026)
- 11Remodeling magazine: 2025 Cost vs. Value report, Seattle (read Nov 18, 2026)
- 12Washington Dept. of Revenue: local sales tax rates, October to December 2026 (read Nov 18, 2026)