
Patio covers · Seattle & the Eastside
Patio covers in Seattle
A roof over the patio or deck, so the space works in the rain as well as the sun. We build solid covers, pergolas and louvered roofs, and we handle the permit when the city asks for one.
Free estimate
Get a price for your patio cover
Tell us about the patio or deck. We come out, measure, and send a written estimate.
License GIANTBS782RZ
A Washington general contractor. Look up the record with the state before you call.
5-year workmanship warranty
On the work our crews build in your home, set out in writing with the estimate.
A free, written estimate
We visit, measure and send an itemized price. You decide with every line in front of you.
Permits filed by us
We prepare the drawings and the applications, and we meet the inspectors.
Types
Four kinds of patio cover
They differ most in how much rain they stop. Choose by how you want to use the space in the wet months.

Illustration Solid roof cover
A framed roof on posts, usually tied into the house, with roofing, a gutter and a finished ceiling. It keeps the rain off completely and can carry lights, a fan or a skylight.
Illustration Pergola
Open beams or slats overhead. A pergola filters the sun and frames the space, but rain comes through. It suits a spot you use on dry days.
Illustration Aluminum cover with a wood-look finish
A flat or low-slope cover made of aluminum panels and posts with a wood-grain finish. Aluminum does not rot and needs no staining.
Illustration Louvered roof
Aluminum slats that turn: open, they let the light in, and closed, they shed the rain. Most are motorized, and some close on their own when a sensor feels rain.
The pictures on this page, the one at the top included, are illustrations made on a computer to show the kind of building described. They are not photographs of finished projects.
Permits
When a patio cover needs a permit in Seattle
In Seattle a building permit is the rule and the exemptions are a short list. Three things the city’s Department of Construction and Inspections (SDCI) says decide it:
- Its guide to decks, fences and arbors (Tip 312) says arbors generally require a building permit.
- Its “Do you need a permit?” page lists the small structures that usually do not: for example a one-story detached shed under 120 square feet, a platform less than 18 inches above the ground, or an open-framed arbor of 120 square feet or less.
- The same page says a permit is always needed for work on load-bearing supports and for changes to the building envelope, however small the job.
A solid-roofed cover fastened to the house is not on the exempt list, so plan on a permit for one. Work that is exempt still has to meet the building code and the rules for your lot. New wiring for lights, a fan or a heater needs an electrical permit, which also comes from SDCI.
Other cities and the counties keep their own lists. The permit navigator works out what a project needs where you live, and the local remodel guides name each city’s permit office.
What we look at on the first visit
- Where the cover fastens to the house, and what is inside that wall
- Where each post lands and what is under it
- Where the roof water will go
- How close the cover comes to the property lines
- Whether the deck or slab can carry the posts
Cost
What sets the price of a patio cover
We do not print a price range here. We found no dependable public figure for patio covers in the Seattle area, and a number without a measured patio would be a guess. These are the things the price is made of.
- The size of the cover and how far it spans without a post
- The kind of roof: framed and shingled, aluminum panels, or louvers
- How it fastens to the house wall or ties into the house roof
- New footings under the posts, or a deck or slab that can already carry them
- Wiring for lights, a fan, a heater or a motor
- Permit drawings and the city's fees
The estimate is free, written and itemized, so you see each of these as its own line. Washington sales tax is charged on the whole contract, labor included: 10.55% in Seattle.
Process
How a patio cover project runs
- 01
Visit and measure
A free visit to measure the patio or deck and look at the house wall, the roof edge and where the posts can stand.
- 02
Design and price
A drawing of the cover with its type, size and finish, and a written, itemized price for the whole job.
- 03
Permit and materials
When the city requires a permit, we prepare and file it. We order the materials while it is in review.
- 04
Build and walkthrough
Footings, posts, roof, gutter and wiring. We keep the site clean each day and walk the finished cover with you.
Reviews
What homeowners have said
“Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”
Jacob M. · Basement finish · June 2024 · on Thumbtack
“Leo and his team did a great job... He did what he promised”
Jacky W. · May 2024 · on Thumbtack
“Leo was on time and listened to our needs... Overall great experience.”
Xinran L. · January 2024 · on Thumbtack
Read every review where it was posted. Counts as of November 18, 2026.
Questions
Patio cover questions, answered
01Do I need a permit for a patio cover in Seattle?
Plan on one. Seattle's guide to decks, fences and arbors (SDCI Tip 312) says arbors generally require a building permit, and the city's short list of exempt structures covers small things such as a one-story detached shed under 120 square feet or an open-framed arbor of 120 square feet or less. A solid-roofed cover fastened to the house is not on that list. The city also requires a permit for any work on load-bearing supports or the building envelope, however small the job. We check your design against the current rules and file the permit when one is needed.
02What is the difference between a patio cover and a pergola?
A patio cover has a solid roof and keeps the rain off. A pergola has open beams or slats: it gives partial shade and no rain protection. A louvered roof sits between the two, because its slats open for light and close against rain.
03Which kind of cover keeps the rain off?
A solid roof cover, or a louvered roof with the slats closed. An open pergola does not. If you want to use the patio through a Seattle winter, start with one of the first two.
04Can you build a cover over an existing deck or patio?
Usually, yes. The question is what holds up the posts. A cover is heavy and catches wind, so its posts need proper footings, and an existing deck or a thin slab may not be enough on its own. We check at the visit and put any new footings in the estimate.
05How much does a patio cover cost?
We do not publish a range, because we found no dependable public figure for patio covers in the Seattle area and a number without a measured patio would be a guess. Size, the kind of roof, the footings, the wiring and the permit set the price. The estimate is free, written and itemized. Washington sales tax applies to the whole contract: 10.55% in Seattle.
06How long does a patio cover take?
The time on site is short compared with a remodel. The drawings, the permit and the wait for materials come first. We give you a schedule with the estimate.
07Which areas do you serve?
Seattle and the Eastside, including Bellevue, Kirkland, Redmond, Mercer Island, Renton and Issaquah, and south through Kent, Auburn and Federal Way to Tacoma.
Get a written price for your patio cover
We measure, check how the cover meets the house and send an itemized estimate. The visit is free.
More detail
Sources
- 01Seattle SDCI: Do you need a permit? (read Nov 18, 2026)
- 02Seattle SDCI Tip 312: decks, fences and arbors for single family homes (revised August 14, 2024) (read Nov 18, 2026)
- 03Washington Dept. of Revenue: local sales tax rates, October to December 2026 (read Nov 18, 2026)
- 04Washington Dept. of Revenue: construction tax matrix (read Nov 18, 2026)