Giant BuildersSeattle · General contractor
Call us
Illustration: a barn-style house with dark board-and-batten siding, a stone gable end and a metal roof, on a rural lot at sunset

Barndominiums · Washington State

Barndominium builders in Washington State

A barndominium is a house inside a barn-style shell, often with a shop under the same roof. They are built on rural land outside the cities, and the county issues the permit. We are a licensed Washington general contractor based in Seattle.

Free estimate

Tell us about your land

Where it is, what is on it today and what you want to build. We answer within one business day.

When would you like to start?

We use your details to answer you. Nothing else.

What it is

What a barndominium is

The word joins barn and condominium. The building is a single-family house with the simple shape of a farm building: a long rectangle under a pitched metal roof, with walls of metal or board-and-batten siding. The frame is usually post-frame, the way pole barns are built, or steel.

Many people who ask for one want two things under one roof: a home, and a large shop or garage with tall doors. The open shell makes that simple to plan, and the inside can be finished like any other house.

  • Illustration: a dark barn-style house with a metal roof and tall glass walls, reached by a concrete path across a lawn, with evergreens behind
    IllustrationA plain gabled shell with large windows on the living side.
  • Illustration: a long dark metal-sided building with three open shop bays at one end and a living wing with a covered porch at the other
    IllustrationLiving space and a three-bay shop under one long roof.
  • Illustration: a white barn-style house with a green metal roof and a wraparound covered porch, behind a split-rail fence
    IllustrationA farmhouse look: board-and-batten siding, a metal roof and a wraparound porch.

The pictures on this page, the one at the top included, are illustrations made on a computer to show the kind of building described. They are not photographs of finished projects.

Where and who

Where a barndominium can be built, and who permits it

These are rural buildings. A barndominium needs room for a long building, a driveway and often a septic field, so it goes on acreage outside the cities, not on a Seattle city lot.

Outside city limits, the county is the permit office. In unincorporated King County that is the Permitting Division of the Department of Local Services. In Snohomish County it is Planning and Development Services. Inside a city’s limits, the city issues the permit.

To the county, it is a house

Washington’s state building code, which includes the International Residential Code, is in effect in every county and city. The state energy code for homes overrides local ones. So a shell sold as a shop or a farm building has to be engineered, insulated and finished to the same standard as any other new house.

What King County asks for with a new house permit
ItemWhat the county says
Jurisdiction and zoningConfirm that the parcel is in unincorporated King County, and check what its zoning allows.
Special conditionsNote any special conditions on the property, such as critical areas.
SewerA certificate of sewer availability, or an on-site septic application for the Health Department's approval.
WaterA certificate of water availability, or a well permit from Public Health.
How to applyOnline, through MyBuildingPermit.com.
From King County's single family residential permit process, read November 18, 2026. Snohomish County also asks for water and sewer approval from its Health Department with each residential application.

Before you buy

What to check on the land first

Septic, water and critical areas decide whether a house can go on a parcel, and where. Check them before you pay for plans or a building kit.

  • Which county or city the parcel is in, and its zoning
  • Critical areas on or near the building site, such as wetlands and steep slopes
  • Whether the ground can take a septic system, where there is no sewer
  • A water source: a district connection or a well
  • A driveway that a concrete truck can use
  • How far power has to come
  • Any private covenants that limit siding, roofing or building style

Planning a second, smaller home on the same land later? King County allows one accessory dwelling unit on a rural lot. See the King County ADU rules.

Cost

What sets the price of a barndominium

We do not print a price per square foot here. We found no dependable public figure for barndominiums in Western Washington, and a number without your land and your plan would be a guess. These are the things the price is made of.

  • The size of the living space and of the shop
  • Site work: clearing, grading, the driveway and the foundation
  • A septic system and a well, or connection fees where there is service
  • Bringing power to the building
  • The shell: post-frame or steel, with its siding and roofing
  • Insulation and the whole interior, which cost what they cost in any new house
  • Engineering, permit drawings and the county's fees

The estimate is free, written and itemized. Washington sales tax is charged on the whole contract, labor included, at the rate for the place where the land is.

Process

How a barndominium project runs

  1. 01

    The land

    Tell us where the parcel is. We go through what the county will ask about it: zoning, critical areas, septic and water.

  2. 02

    Plan and price

    A floor plan for the home and the shop, the engineering the shell needs, and a written, itemized price.

  3. 03

    Permits

    We prepare and file the building permit application and coordinate the septic and water approvals it depends on.

  4. 04

    Build

    Site work and foundation, then the shell, then the house inside it: framing, wiring, plumbing, insulation and finishes.

  5. 05

    Walkthrough

    We walk the finished home with you and close out every item on the list before we call it done.

Reviews

What homeowners have said

Reviews of Giant Builders, shown where they were posted.

  • “Leo and team were fantastic! The team completed a full finish of our sub-basement in under 3 weeks”

    Jacob M. · Basement finish · June 2024 · on Thumbtack

  • “Leo and his team did a great job... He did what he promised”

    Jacky W. · May 2024 · on Thumbtack

  • “Leo was on time and listened to our needs... Overall great experience.”

    Xinran L. · January 2024 · on Thumbtack

Read every review where it was posted. Counts as of November 18, 2026.

Questions

Barndominium questions, answered

01

What is a barndominium?

A single-family house with the simple shape of a farm building: a long rectangle under a pitched metal roof, with metal or board-and-batten siding. The frame is usually post-frame, the way pole barns are built, or steel. Many have a large shop or garage under the same roof as the living space.

02

Can I build a barndominium in King County?

On rural land in unincorporated King County, a barndominium goes through the same permit process as any other new single-family house, subject to the parcel's zoning. The county asks you to confirm the jurisdiction and zoning, to note special conditions such as critical areas, and to show sewer or septic approval and a water source with the application. Check any private covenants on the parcel as well.

03

Who issues the permit for a barndominium?

Outside city limits, the county. In unincorporated King County that is the Permitting Division of the Department of Local Services, and applications go in through MyBuildingPermit.com. In Snohomish County it is Planning and Development Services. Inside a city's limits, the city issues the permit.

04

Does a barndominium have to meet the same building code as a regular house?

Yes. Washington's state building code, which includes the International Residential Code, is in effect in every county and city, and the state energy code for homes overrides local ones. A shell sold as a shop or farm building has to be engineered, insulated and finished to the same standard as any other new house.

05

Is a barndominium cheaper than a regular house?

Sometimes. The simple shape can save framing labor, but the site work, the septic system, the well, the insulation and everything inside cost what they cost in any new house. We cannot back up a claim that one costs a fixed percentage less, so we do not make it. We price your plan on your land.

06

Can it have a shop or garage under the same roof?

Yes. The open shell suits it. The shop and the living space are drawn as separate areas under one roof, each with its own doors, and its own heating if you want it.

07

How long does it take to build a barndominium?

It depends most on the land. The septic design, the water source and any critical areas review come before the building permit, and the length of the county's review is not ours to set. Construction follows the permit. We give you a schedule with the estimate.

08

What should I check before buying land for a barndominium?

Which county or city the parcel is in and its zoning, whether critical areas such as wetlands or steep slopes touch the building site, whether the ground can take a septic system, and where water and power will come from. Those decide whether and where a house can go on a parcel, so check them before you pay for plans or a building kit.

Start with the land

Tell us where the parcel is and what you want on it. We answer within one business day, and the estimate is free and in writing.