Before and after · Bathrooms
Bathroom remodel before and after photos
Giant Builders project photos. Each pair is one bathroom before the work and the same bathroom after it. Drag the line across a photo to compare the two.
- WA contractor license
- GIANTBS782RZ
- UBI
- 604991679
- Permits
- Prepared and filed by us
- Workmanship warranty
- 5 years
- Estimate
- Free, in your home, in writing
Bathrooms, before and after
Drag the line, or use the arrow keys, to wipe from the room as it was to the room as it is now. The photos are shown without addresses or names.
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter
What to look for in a bathroom before and after
- The shower. Did a tub become a walk-in shower, and is the glass frameless?
- The tile. Look at how the lines meet at the corners, the niche and the window.
- The vanity. Is there more counter and more storage in the same footprint?
- The lighting and the mirror. A dark bathroom usually gets both changed.
- The layout. If the toilet or the shower moved, the plumbing under the floor moved with it.
A before and after pair shows the finish. It does not show the wiring, the plumbing, the framing and the permits behind it, which is where most of the work in a remodel goes.
Our bathroom remodeling page explains what is included, what it typically costs in Seattle and how the work runs. If you are still choosing a look, the bathroom design ideas are grouped to make that easier.
Free estimate
Want this for your bathroom?
Tell us a little about the room. We come out, measure, and send a written, itemized estimate.
Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.
