Skip to the content

Before and after · Basements

Basement finishing before and after photos

Giant Builders project photos. Each pair is one basement before the work and the same basement after it. Drag the line across a photo to compare the two.

WA contractor license
GIANTBS782RZ
UBI
604991679
Permits
Prepared and filed by us
Workmanship warranty
5 years
Estimate
Free, in your home, in writing

Basements, before and after

Drag the line, or use the arrow keys, to wipe from the room as it was to the room as it is now. The photos are shown without addresses or names.

  • Basement finish no. 1: after
    Basement finish no. 1: before
    BeforeAfter
  • Basement finish no. 2: after
    Basement finish no. 2: before
    BeforeAfter
  • Basement finish no. 3: after
    Basement finish no. 3: before
    BeforeAfter
  • Basement finish no. 4: after
    Basement finish no. 4: before
    BeforeAfter
  • Basement finish no. 5: after
    Basement finish no. 5: before
    BeforeAfter
  • Basement finish no. 6: after
    Basement finish no. 6: before
    BeforeAfter
  • Basement finish no. 7: after
    Basement finish no. 7: before
    BeforeAfter
  • Basement finish no. 8: after
    Basement finish no. 8: before
    BeforeAfter
  • Basement finish no. 9: after
    Basement finish no. 9: before
    BeforeAfter
  • Basement finish no. 10: after
    Basement finish no. 10: before
    BeforeAfter
  • Basement finish no. 11: after
    Basement finish no. 11: before
    BeforeAfter
  • Basement finish no. 12: after
    Basement finish no. 12: before
    BeforeAfter

What to look for in a basement before and after

  • The ceiling. Look at where the beams, pipes and ducts went: boxed into soffits and tray ceilings, so the low spots look planned.
  • The posts. Steel posts in the middle of a room get wrapped as columns or built into a wall.
  • The floor. Bare concrete becomes carpet, plank or tile.
  • The light. Bare bulbs on the joists give way to recessed lights in a finished ceiling.
  • The use. A storage area becomes a family room, a bar, a home theater or a gym.

A before and after pair shows the finish. It does not show the wiring, the plumbing, the framing and the permits behind it, which is where most of the work in a remodel goes.

Our basement finishing page explains what is included, what it typically costs in Seattle and how the work runs. If you are still choosing a look, the basement design ideas are grouped to make that easier.

Free estimate

Want this for your basement?

Tell us how you want to use the space. We come out, look at the walls, the slab and the ceiling height, and send a written, itemized estimate.

Washington general contractor GIANTBS782RZ, registered with the Department of Labor & Industries. The record is public.

When would you like to start?

We use your details to answer you. Nothing else.